Adds setting to eliminate the gap between the list of tasks and the footer.
Features
- Added support for setting a default font when a project is rendered to PDF.
- Renumber WBS codes similar to Microsoft Project's "Renumber" function.
- Added setting to eliminate the gap between the list of tasks and the footer.
Fixes
- Task notes not saved for template file from MSP 2016.
- Resource assignment units raise exception when large value is set.
- Task duration becomes zero if multiple resources are assigned.
- Project reading exception while loading MPP file.
- Resource assignment has incorrect baseline start/finish date.
- Font Family not set in MPP.
- Header text is only changed for the default view.
- Time phased data not added to the resource assignment time phased data collection.
- Task Split parts lost while setting the %Complete.
- Incorrect Link Type generated while saving project to MPX.
- Summary task fields are empty.
- getResourceAssignment().getByUid() function does not select proper entry.
- MPP with formulas gets corrupted after saving.
- Summary task is not updated for Actual Start, %Complete and Actual Finish.
- Tasks with custom time phased data have different finish date while opened in MSP.
- Recalculate raises exception.
- Saving project file corrupts output file.
- Project data lost after loading and saving MPP 2016 file.
- Exception raised while loading project from memory stream.
- GanttBarStyle not set for summary task.
- XER file cannot be read with all cultures.
- Dates and tasks duration are not correct.
- Not all properties of extended attributes are filled.
- Data lost when MPP file re-saved as MPP.